All Types of Electrical Installation
Every cable. Every connection. Every standard — from incoming power to the last field device, executed by our trained site teams.

We handle complete electrical installation across industrial facilities — from HT/LT cable laying and motor terminations to PLC panel wiring, earthing, and hazardous area lighting. Every connection made to approved drawings, IS/IEC standards, and your project schedule.
Panels to Plant Wide Installations,
We've Got You Covered.
| Pan-India Execution
| IS/IEC Standards
| Approved Drawing Compliant

What We Install
Complete installation scope — 5 categories
Our site teams cover every electrical installation discipline — from high-voltage power infrastructure down to field instrument wiring and hazardous area lighting.
Power & Distribution
HT/LT cable laying, termination and cable tray installation
Bus duct installation, jointing and power distribution boards
Transformer, DG set and UPS installation and integration
Control & Instrumentation
PLC, HMI panel installation and field instrument wiring
Sensor, limit switch and proximity switch wiring
Interlock, safety circuit and marshalling panel termination
Motors & Drives
Motor installation, alignment, earthing and cable termination
VFD, soft starter and DOL starter wiring and control cable routing
Earthig & Lightning Protection
Equipment and structural earthing as per IS 3043
Earth pit installation, lightning arrester and equipotential bonding
Lighting & Small Power
Industrial, emergency and hazardous area lighting installation
Power socket and small power distribution

Site Execution
Our 5-step installation process
Every site starts with readiness checks and ends with tested, documented handover — no shortcuts, no open items.
01
Site Readiness Check
Review approved drawings, check cable schedules and confirm civil readiness before mobilising our team.
02
Cable Laying & Routing
Tray installation, conduit fitting and cable pulling per approved layout — with proper power/control segregation.
03
Termination & Dressing
Every cable ferrule-marked, glanded, dressed and terminated per wiring diagram — no loose ends.
04
Testing & Continuity Check
Point-to-point continuity, insulation resistance and loop checks carried out before energisation. All results documented.
05
Energisation & Handover
Controlled energisation with our team on site, punch-point closure, and as-built marking before handover.
Our Edge
Why clients trust N2S on site
We work strictly to approved drawings, keep power and control cables segregated correctly, and hand over with clean terminations and full documentation — first time, every time.
Drawing-Compliant Work
Every termination made strictly to approved drawings — no improvisation on site.
Cable Segregation
Power and control cables routed and dressed separately throughout — no signal interference.
Full Documentation
Test reports, as-built markings and punch-list sign-offs before any handover signature.